“We have large jobs, so we had a need for a large pump," says Pepi Cancio, Jr., president of C&C Concrete Pumping Inc. "The five-section, 62-meter pump gives us the flexibility we need to cover basically any job, so we have a lot more opportunities.”
The pump was delivered in August and is the largest operating concrete boom pump in Florida.
"With a pump this large, energy consumption can be an issue," Cancio says. "With the Sermac pump, we can pump all the time in low idle. It saves on fuel and on the equipment, and that's important to us."